Travelled the Arbutus Greenway on its temporary surfaces today. A few things to see (at least temporarily), as the temporary planned temporary surfaces come into being, prior to resumption of design consultation.
Signs of humans. A service (Mobi).
Click to expand and get into the captions.
- Bark mulch and separation. Between 16th and W 33rd Ave.
- The plan for a variety of temporary surfaces.
- Mobi, and someone getting a shoulder ride
- Signs of humans — probably little ones. Skateboard dude asks for PEACE.

















The bark mulch path looks good for walking the dog.