Arbutus Greenway Passing ThoughtsOn October 15, the City of Vancouver will release consultation results and the design for a temporary surface (or surfaces) on the…
Arbutus Greenway PixTook a ride along the temporary version of the Arbutus Greenway from 10th Ave to 37th Ave on Saturday, Sept…
Arbutus Greenway Consulting ExpandedLots of interest, it seems, on this one — consultation on the temporary surface to be applied to the Greenway prior…
Arbutus Greenway – Let's Talk Temporary Pathway Consultation: From the City of Vancouver: The Arbutus Greenway is a future north-south transportation corridor that will…
Arbutus Greenway: What's Up?Had a chance to cycle the Arbutus Greenway from 41st Avenue to Cypress. As reported, the paving project to provide…
Arbutus Greenway — Examples and IdeasOperating on the premise that we’ve built Greenways before in Metro Vancouver, and don’t have to start from a conceptual…
Another Voice On Arbutus GreenwayBased on the concerns expressed to City of Vancouver on the type of temporary surface for the Arbutus Greenway’s pre-consultation…
Evidence: Third Stage of Cycling Infrastructure – 3The third stage of cycling infrastructure includes the build-out of a network of separated routes without a lot of controversy…
Arbutus Update: To Pave or Not to PaveDon’t you love living in a town where this is a big news item: The City of Vancouver has backed…
Arbutus: Only for some ages and abilities?Let’s jump right in: From The Sun: When finished, it will be nine kilometres of wide, smooth-surfaced path flanked by gravel…
Evidence: Third Stage of Cycling Infrastructure – 2The third stage of cycling infrastructure includes the build-out of a network of separated routes without a lot of controversy…
Go Greenway!! Go Arbutus!!From the City of Vancouver: July 15 2016 Temporary pathway installation gets under way next week The removal of train…
Dec. 19, 2022Vancouver’s “Dinosaurs Against Fossil Fuels” (DAFFS) Way Ahead of Their TimeSandy James Planner